Thursday, December 16, 2010

Kitchen Installation - Day 2

Today was another full day of kitchen installation. The two guys got here at 8:30 and started right away to get things done. At around eleven o'clock Ikea showed up with the new panels. Of course, one of them was the wrong one. Another colleague went to the Ikea himself to pick up the right one and then joined the other two for a while here.

The stove, oven, and fridge have been installed as well as the sink, drain and dishwasher. After getting the sink all in place they tested it for leaks and, sure enough, there's a leak. It was discovered that the bottom of the sink wasn't finished properly, causing the leak.

Tomorrow they will come back to install the cabinet shelves and attach the handles. One of them will make a quick trip to the Ikea to exchange the sink. And then.... the kitchen will be done! Well, not really. We'll still have to do the finishing - tiles, wall, paint, and floors. But the biggest chunk will be done!

Busy at work.

And then there were three.

End of day two.

1 comment:

Rachel said...

dat ziet er echt heel mooi uit! En beter wat langer er aan werken dat jullie straks echt blij en tevreden zijn met het resultaat dan maar ongelijke kleuren te nemen...wat een slordige fout van de IKEA! succes met de laatste klusjes!